6 months time is already saved because it is already partially developed and improved due to $25,000 work already being done: 1000 gallon Septic is already installed in the ground and its' recent inspection says it is ''functional''. Water meter and water lines are already installed and ready to be hooked up with future home. The power pedestal is already installed and lines are buried in the ground but there is no power meter yet. Land with private water company (Tonto Basin). No flooding and wash zone, Flat land with dirt road. Zoned for manufactured home installation or for building of regular home. Impact fee of four thousand already paid.
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...